Many post tensioned slabs will be stamped to alert the owner and any renovation contractors that the slab is post tensioned.
Post tension cable repair cost.
We are dedicated to providing the construction industry with engineering expertise responsive service and manufacturing excellence to ensure safe timely and cost effective installations restorations and repairs.
Early identification and mitigation of corrosive conditions can significantly reduce the costs of major repairs and the risk of structural failure.
Slab foundation repair cost can be expensive and may even cause collateral damage with extra costs as well.
A concrete slab foundation problem needs prompt evaluation and.
At granite we perform slab foundation repairs as well as pier and beam foundation repairs.
Tendon cable tails after tensioning.
Post tensioning pt is one of the most advanced and efficient technologies used to reinforce concrete.
Corrosion can occur in grouted and ungrouted post tension structures leaading to post tension cable repair in the presence of moisture and air in voids along the cable tendon.
It is very difficult to repair.
The forces contained within post tensioning tendons demand that owners designers and contractors who maintain these structures have a high level of technical knowledge and skills to ensure the safety of the structure and of individuals working on near or in the vicinity of a post.
For span lengths over 20 22 feet pt slabs are often more cost effective.
Suncoast post tension is north america s largest unbonded post tension specialist.
For the repair and modification of post tensioning pt systems as well as post tensioned concrete structure repair and protection structural technologies offers highly specialized products and services including investigation repair design support repair and replacement components corrosion protection products strengthening solutions as well as new or replacement post tensioning systems.
Concrete reductions up to 25 and rebar reductions up to 65 are typical.
Having all the facts before you begin repairs will help you choose the right company and avoid unexpected cost and delays.
Shoring and formwork can be removed as soon as the tendons are stressed.
Post tensioned concrete is a unique structural system that is widely used to construct many types of structures such as bridges parking structures buildings and tanks.
The cables are pulled to 33 000 pounds resulting in 8 inches of elongation in a 100 foot cable.