Low profile roof and wall system trapezoidal rib on 9 centers minimum roof slope.
Pro rib roofing installation.
Learn the correct fastening technique for pro rib and premium pro rib fasteners.
Using screws fasten roof at top and bottom of the sheet in the flat next to each rib.
Cut the first rib off leaving of rib on the first roof sheet of roof steel.
For use by its customers and is intended to be a guide only.
18 pro rib metal sof t gauge.
Accessories fasteners recommended tools accessories 13 dektite pipe flashing sealant durasil malco folding tool 18.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowl.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater.
Pdf 2 mb interior liner panel.
Pdf 740 kb steel siding installation.
2020 9 accessories note.
Install the roofing screws vertically along each rib in the panel.
Lay down the first roof steel panel squaring it with the mason line.
Pdf 31 kb ul 529 pro snap roof construction.
The installation of metal roof systems is a dangerous.
The roof panels are installed similar to the wall panels in layout.
Panel width 38 installation coverage 36 with 3 4 rib height can be used for residential roofing out buildings and post frame applications.
Place the first screw about 7 inches from the bottom and each subsequent screw about 18 to 24 inches apart along the vertical run.
Pdf 2 mb chimney flashing instructions.
Florida building code allows a minimum pitch of 2 12 for grand rib 3 panels as long as lap screws and sealant are applied to the laps to prevent water from siphoning over the ribs see fig.
Pro panel ii install guide.
Custom cut lengths from 2 to 36 in 1 increments available for special order in menards store or on menards com.
Pdf 27 kb menu.
All intermediate fasteners can be.
This guide is supplied by fabral inc.
The washer under the screw head should seal to the surface of the panel without bulging or shifting.
Installation of panels roof pitch this style of metal roofing panels requires a certain degree of pitch to ensure proper water drainage.
Revision 1 2 an.
Premium pro steel gutter systems installation.
3 12 ul 2218 impact resistance class 4.
This guide must by read in its entirety before beginning installation.
All trims are 26 gauge.